Alphabug wrote:
Paul / TS / CS.....
All things being equal, as far as you know, how are things happening with the vendor for the parts for the "V2" Einsteins ?
At this stage, are things still on the original (about August 20th) schedule ?
Thanks,
AB.
As far as we know, all parts are on schedule, both in China and Nashville. We are progressing well on redesign and drafting of power supply board and have direct control of this. Our China metal/plastic vendor is extremely reliable in meeting his schedules.
We expect first samples in about 14 days, and his production is quite fast and responsive. But the ever present caveat is the possibility of a mistake on my part in the CAD work or in the mold makers part.
The new front end assembly is die cast zinc alloy and involves three molds and two die cut pieces. I have stressed the importance of accuracy and lack of burrs and mold flash, etc. Should there be a problem with the initial samples, the molds aren't too difficult or time consuming to rework, but should this happen it could potentially set us back a couple of weeks. These are things no human can 100% predict and I am 100% human.
But I can predict with good certainty these changes will correct all issues.
Somehow my "end of August" became "Aug 20" Aug 20 is the target for having everything in place and ready to begin production, but the end of August has always been the realistic shipping target.